MIL-ST0-1518E
6.4 Changes from previous issue. The margins of this standard are marked with vertical lines to indicate where changes from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue.
TABLE I. Sampling requirements and test limits.
ITEM |
SAMPLE POINT |
TEST |
TEST LIMITS |
SAMPLE FREQUENCY |
1. |
Pipeline receipts. |
|||
1a. |
Pipeline header upstream of any filtration. |
Visual for color, water and solids. |
Clear and bright without visual solids or free water. |
Each receipt, 1 hour after start, after line displacement, and at each 4 hour interval thereafter. |
Solids/0P. Color and particle assessment method (ASTM 02276 Appendix 3) |
See Note 1. |
Each receipt, one hour after start, after line displacement and at each six-hour interval thereafter. Not required when receipt filtration is present. |
||
FSII. (ASTM 05006) (when additized) |
See TABLE II. |
Each receipt, one hour after start, after line displacement and at each six-hour interval thereafter. |
||
Conductivity (when additized) |
50 - 700 CU. |
|||
Flash Point. |
See TABLE II. |
Any time after line displacement. |
||
1b. |
0ownstream of filter separator if installed. |
Solids/0P. Color and particle assessment method (ASTM 02276 Appendix 3) Matched Weight monitor (ASTM 02276) Bottle Method (ASTM 05452) |
See Note 1. |
Every 7 days or next receipt. Take one downstream sample in conjunction with any one of the upstream samples, compare the results. |
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business